The Red Line corridor is proposed to connect the cities of Westfield, Carmel, Indianapolis, and Greenwood with frequent and reliable transit service. Phase 1 of the project, which is entirely within Marion County, is moving forward and will begin construction early next year.

In the Marion County Transit Plan, the Red Line will be extended to the county lines both north and south. The southern extension will take the Red Line from the University of Indianapolis to County Line Rd on Madison Ave. Two northern extension alignment potentials are still in discussion. Public Meetings and input on the Marion County Extensions will take place in 2018.

Construction and operational funding for the Red Line Extensions within Marion County were included in the Marion County Transit Plan referendum. Funding has not been identified for construction and operation of the Red Line extensions in Hamilton and Johnson counties. Any future Red Line extension outside of Marion County will depend on local jurisdictions to commit local funds for construction and operation.

Red Line Full Corridor Map

 

Click on each extension below to learn more information.

Overview 

In Marion County, the Red Line will be extended to the county lines both north and south. The southern extension will take the Red Line from the University of Indianapolis to County Line Rd on Madison Ave. Two northern extension alignment potentials are still in discussion. Public Meetings and input on the Marion County Extensions will take place in 2018.

Map

Overview 

The Hamilton County Extension of the Red Line is proposed to run from the northern boundary of Marion County up to Grand Park in Westfield. Early design work was funded through a Transportation Investment Generating Economic Recovery (TIGER) Grant and local funds from Carmel and Westfield. IndyGo has conducted stakeholder engagement and worked with Carmel and Westfield on preliminary engineering details.

Environmental Review for Grand Park Station 

A proposed Red Line Station in Westfield at Grand Park will be located on an existing parking lot. The station would not adversely affect the activities, features, or attributes associated with Grand Park that qualifies it for protection under Section 4(f) of the Department of Transportation Act of 1966. Based on the analysis conducted by IndyGo, it is the intent of the FTA to issue a de minimis or minimal impact finding.  You can view the public notice here in English. Public comment can be left online about the proposed station here.

Noticia en Español.

Map

Maps showing proposed Red Line Hamilton County Extension.

 

Overview 

The Johnson County Extension will run from County Line Rd down to Smith Valley Rd along Madison Avenue in Greenwood.  Early design work was funded through a Transportation Investment Generating Economic Recovery (TIGER) Grant and local funds from Greenwood. IndyGo has conducted stakeholder engagement and worked with Greenwood on preliminary engineering details.

Map